Shear Wall Shake Table tests (october 2018) Start up the shake table CLP --Yehuda 2018-10-23 19:00 GPST Collected data until ~22:30 Set up new RTD for shear wall test at shake tables (removed from geodrt5), replacing CLP. Added third station STPB to RTD. --Yehuda 2018-10-23 05:45 GPST Starting tracking for PPP tests --Yehuda 2018-10-24 16:15 GPST Stopped tracking for PPP test 2018-10-24 21:30 GPST Starting tracking about 15:00 GPST at shake table with three receivers: STPA, STPB, STSW --Yehuda 10-26-2018 Ended tracking 00:50 2018-10-2018 --Yehuda 2018-10-27 04:30 Started tracking on 2018-10-29 ~15:00, end at 22:30 GPST Two white noise and on design (19:45 GPST) tests --Yehuda 2018-10-30 02:45 GPST Started tracking 2018-10-30 15:17 GPST, Yehuda First Pull test ~18:50-19:05 GPST Second Pull test at ~21:45-21:55 GPST --Yehuda 2018-10-30 22:05 GPST Disconnected @ 22:47 GPST Connected at 18:36 GPST Disconnected at 21:23 GPST Tests done, equipment will be torn down. --Yehuda 2018-10-31 21:30 GPST One receiver set back up at shaketable.(20:34 GPST) --Yehuda 2018-11-16 21:25 GPST Set up CLP for CWU and JPL --Yehuda 2018-11-17 23:20 GPST Reset coordinates for STSW, 2018-11-19 18:40-18:45 --Yehuda Increase latency to 10s --Yehuda 2018-11-20 07:25 GPST Updated metadata for STPA and STPB, turned them on, --Yehuda 2018-11-20 08:30 GPST Conducted series of dynamic tests on 2018-11-20, swapped in 10Hz Topcon Net G3-A instead of 1Hz Trimble NetRS --Yehuda 2018-11-21 05:15 GPST Conducted three dynamic, one pull, 2 white noise on 2018-11-21 Left receivers running until teardown of structures --Yehuda 2018-11-22 05:30 GPST STPA went down on Saturday evening ~5:30 GPST 11/24 (power failure - Trimble NetR9 didn't reboot. STPB turned off by Dorian on Monday morning 11/26 ~18:30 GPST --Yehuda 2018-11-26 18:42 GPST STPA Trimble rebooted on Tuesday morning, ~17:00 --Yehuda 2018-11-27 18:25 GPST Pull test on 2018-11-28 `~19:00 Stations broken down ~23:50 --Yehuda 2018-11-29 00:40 GPST Use UNAVCO server for CAT2 and SBCC instead of OCRTN (CLP_All) CAT2 was at 206.194.127.186:7007 SBCC at 206.194.127.186:7003 --Yehuda 2018-11-29 22:30 GPST STSW and STPB (on shear walls) have started tracking. --Yehuda 2018-12-07 ~23:12 GPST STPA started at ~23:40 GPST First set 2018-12-10: SOPAC Shear Wall Solutions 2018-12-10 1% white noise 2018-12-10 18:11:30 to 18:15:45 GPST 3% white noise 18:17:00 to 18:21:20 small shake 18:45:00 to 18:46:00 (drone was used) test shake 19:16:30 to 19:19:00 GPST White noise 19:21:10 to 19:25:20 small shake 19:28:40 to 19:29:00 1.5% white noise 19:31:00 to 19:35:00 3% white noise 19:36:15 to 19:31:00 Second set: shake 20:39 to 20:40 1.5% white noise 20:42 to 20:47 3% white noise 20:50 to 20:55 Big shake 21:36 to 21:37: GPST Shear Wall experiment 2018-12-19 white noise test ~20:40 Shake ~21:10